Phase 1 Milestone Inspections
Top-trained professional engineers visually inspect the items mandated by SB 4-D to determine your building’s structural integrity and safety.
Bid Packages
We review all repair options with the BOD, and then produce a detailed scope & material specifications for a “sealed envelope” bid process.
Reserve Studies
The one-stop shop. Structural integrity reserve studies (SIRS), as well as the traditional reserve studies.